If I start this blog with the words “back-up,” I’ve already lost you. Talking BC/DR to customers puts them to sleep faster than a box of red wine and a turkey dinner.
But, if I talk about availability, risk management, compliance, and ensuring that your CEO’s fat-fingered deletes are reversible, well, that gets attention.
One of my favorite products on the market is Zerto. Zerto provides enterprise-class business continuity and disaster recovery (BC/DR) solutions for virtualized infrastructure and cloud. They won Best of Show at VMworld 2011, as well as 2011, 2012, and 2013 Product of the Year Gold Awards. It’s the industry’s first hypervisor-based replication solution for tier-one applications.
With Zerto you can sequentially and automatically fail over and back the VMs that comprise your critical applications.
With RPOs of seconds and RTOs consistently less than five minutes, you don’t have to worry about any downtime.
They are hypervisor and hardware agnostic. Vsphere 5.0 to Vshpere 6.0 and back to Hyper-V. 3Par to Zadara to Nimble, etc.
With non-disruptive testing, you can fail over and back on a live environment with no  Zerto Datacenter disaster recovery and migrations Zunesisimpact to production. Best of all, Zerto can run the DR test automatically, generate a report of the execution, and deliver it directly to risk management.
That last point gets lost. Let me repeat it. DR testing is non-disruptive.
There’s nothing else like it. Do yourself a favor and check out unbiased reviews at Spiceworks. 5 stars out of 7 reviews. To quote one of them, “Zerto is….dare I say, life changing.”
At Zunesis we also use Zerto for data center migrations. Zerto even lets you try the product for free. It’s an awesome piece of software, and I really encourage you to take a look.

A flood that damages mission-critical equipment is among the worst scenarios a data center can face, offering little hope for a quick fix. On April 13, 2015, the Zunesis team received a “first responders call” from a long-term public sector customer who had the misfortune to experience a broken water main that left their main data center under 2 feet of standing water.

The call for help came at 4 p.m. on a Thursday afternoon. Zunesis joined forces with HP and immediately responded to assess the damage. By the next morning, it was clear that the data center was living on borrowed time. With 18 racks of equipment compromised, it was imperative that the team immediately instigate a full Data center fail-over. Luckily, a secondary data center had just been completed, along with plans started for a full DR site; but those plans were stalled as the organization waited for additional funding to become available.

A two-fold plan was quickly put into place to swiftly expand the new data center to capacity while keeping the damaged data center up and running. The insurance company was immediately engaged to begin the replacement exercise while Zunesis and HP jumped in to “keep the lights on” in the existing data center.  Immediately needed were a large supply of extra drives; power supplies; cables; switches; and, most daunting, an emergency 120TB SAN array to move data to safety.

Zunesis Datacenter Disaster RecoveryBy Friday morning, emails had been circulated to the highest levels of HPE and Zunesis requesting emergency assistance. Zunesis quickly moved a 3Par 7200 array from its own internal lab to the customer site and expanded an additional 100TB in an emergency drive order to migrate data.   HP called in emergency supplies from all over the Americas. Extra drives, power supplies, cables, switches, and even servers arrived throughout the weekend. Within 48 hours, the teams had built up enough reserves to keep the data center live until all of the data could be migrated.
Although all IT organizations know that it’s critical to have a solid DR plan and failover Data center in place, the reality is that the Data center spotlight is on monitoring and compliance; and the loss of a main data center is crippling. The second most common cause of catastrophic failures (after electrical) in the Data center is water leaks. Taking the following three steps can help avoid a flood disaster:

 

  • Initial survey to ensure that the location of our data center is not in a flood plain and that the site is well protected from external water sources. Confirm that the fabric of the building is well enough designed and properly maintained to prevent the ingress of rain (even in extreme storm conditions). Check how sources of water inside the building are routed (hot and cold water storage tanks, pipe runs, waste pipes, WCs, as well as water-based fire suppression systems in the office space). Office space above a data center is almost always dangerous from a water ingress perspective.
  • Protection to ensure that any water entering the data center does not have the opportunity to build up and cause a problem. If you are really worried, install drains and a sump pump under the plenum floor. Ensure that the floor space is sealed and that all cable routes through partition walls are stopped up to be air and water tight.
  • Monitoring is critical in a data center – we absolutely need to be able to detect water under the plenum floor. Generally, water detection systems use a cable that runs under the floor and causes an alarm to be triggered if it comes into contact with water.

Click to find out more about our Disaster Recovery Assessments.

GET IN TOUCH

EMAIL: info@zunesis.com

  

CORPORATE OFFICE

Zunesis, Inc.
4B Inverness Ct E Suite 100,
Englewood, CO 80112
(720) 221-5200

Las Vegas
6671 Las Vegas Blvd S
Building D Suite 210, Office 260
Las Vegas, NV 89119
(702) 837-5300

Copyright © 2023 Zunesis. All Rights Reserved. | Website Developed & Managed by C. CREATIVE, LLC